Saturday, September 25, 2010

Week 8

This week fascia and gutters were installed on the lower roof and progress was made on the trusses for the top roof.


Here are views to the east, west and up the stairs:

 West

East

Next week, scaffolding will come in and we will finish off the lower roof and complete the trusses for the upper roof.


Sunset view out the Master Bedroom window.
 

Sunday, September 19, 2010

Week 7

This week, we made progress in two areas...


The front and side porticoes were built...

 
... and the trusses for the lower roof were installed.


We will be moving onto the upper roof next week.

Saturday, September 11, 2010

Week 6

This week the mid floor was completed and the upper frames arrived...


And were put up.

 

View from the Master Bedroom upstairs:

Panoramic

View to the East:


We hope to have the roof on by the end of the month!

Friday, September 3, 2010

Week 5

View of Ravello Rise from the North East

The first floor frames have been completed and the floor joists for the second floor have begun to be installed.


Installing the floor joists, we were able to get a preview of the great view over the valley to the south from the second floor.

Installing floor joists.
View of the back of the house
Building paper for the first floor went on towards the end of the week.



Another good week at Ravello Rise, next week we hope to have the second storey floor completed!

Friday, August 27, 2010

Week 4

This week the frames for the bottom floor arrived and were stood. The steel beams arrived towards the end of the week and were installed on Friday morning.

 
  
The rain eased this week allowing the site to dry out, which was good.


The frames went up without a hitch and fit together perfectly thanks to the precise work of our foundation team, chippie and timber supplier!


Steel beams were installed on Friday morning. 


 

At the end of the first month of construction at Ravello Rise we are pretty happy with the progress of Lot 40.

Sunday, August 22, 2010

Week 3


We had quite alot of rain this week on Ravello Rise. Despite this, the concrete slab has been completed, drains and services have been installed and the site is in the process of being tidied up for construction to commence.

Foundations ready for concrete
Concrete just after it was poured.
Getting ready to put in drains and services.

Concrete slab complete. Next week, frames!

Friday, August 13, 2010

Week 2


Beautiful weather going into week 2 of the build.


With retaining work done, this week we are hoping to complete the underfloor insulation and steel reinforcing for the concrete block. 

Insulation and steel going in.

 

Rain predicted over weekend... we are again hoping for good weather next week as we will be pouring concrete!

Saturday, August 7, 2010

First week onsite.


Site has been cut and flattened. Driveway crossing has also been cut.


Blocks at rear of house laid.


Views of land across the street and of Ravello Rise itself.



Have had quite a bit of rain this week, hoping for better weather next week!